HV substations up to 400 kV
20–400 kVSubstation construction as EPC and turnkey. It starts with surveying and geoelectrical and geotechnical testing, continues through levelling, earthworks, perimeter wall, control building, equipment foundations and cable trenches, and ends with the earthing system, gantry structures, aerial busbar, yard equipment, LV and MV panels, cabling, testing and commissioning.
EPC · turnkey · 20 to 400 kV